Viale I Maggio, 13 Barberino di Mugello (FI)

Automation & Safety System Modernization

Project Name & Client

MV Distribution Upgrade – Officine Maremma S.r.l.

Location

Grosseto, Tuscany

Type of Work

Industrial electrical upgrade, medium-voltage integration

Client Problem

The client’s existing distribution system could no longer support new machinery and was causing frequent downtime. They needed a safe, compliant, and efficient upgrade without interrupting production.

What We Delivered

We installed a new medium-voltage cabin, upgraded all distribution boards, and added surge protection and power monitoring systems to stabilize operations.

Key Technical Details

  • Capacity / Voltage: 20 kV MV system
  • Equipment Installed: MV switchgear, 630 kVA transformer, custom-built control panels
  • Timeline: 6 weeks

Result

Production stability improved by 40%, downtime was eliminated, and the new system is fully compliant with CEI 0-16 standards.

Related Posts