Project Name & Client
MV Distribution Upgrade β Officine Maremma S.r.l.
Location
Grosseto, Tuscany
Type of Work
Industrial electrical upgrade, medium-voltage integration
Client Problem
The clientβs existing distribution system could no longer support new machinery and was causing frequent downtime. They needed a safe, compliant, and efficient upgrade without interrupting production.
What We Delivered
We installed a new medium-voltage cabin, upgraded all distribution boards, and added surge protection and power monitoring systems to stabilize operations.
Key Technical Details
- Capacity / Voltage: 20 kV MV system
- Equipment Installed: MV switchgear, 630 kVA transformer, custom-built control panels
- Timeline: 6 weeks
Result
Production stability improved by 40%, downtime was eliminated, and the new system is fully compliant with CEI 0-16 standards.